# DeepSeek 在内蒙古建设 1GW AI 数据中心

- 来源：Rohan Paul (@rohanpaul_ai)
- 发布时间：2026-08-01 17:32
- AIHOT 分数：55
- AIHOT 链接：https://aihot.virxact.com/items/cmsa7974j02vqrox0u6wyponk
- 原文链接：https://x.com/rohanpaul_ai/status/2083486042741788818

## AI 摘要

DeepSeek 正在内蒙古建设 1GW AI 数据中心，为其首个超大规模园区，位于北京西北约 350 公里，并计划向邻近运营商租用额外算力。选址部分因当地年均约 4°C 气温可降低冷却能耗；该规模园区按 Nvidia 估算成本约 $50B，但中国建设通常远低于美国价格。

## 正文

Bloomberg： DeepSeek is building a 1GW AI data center in Inner Mongolia， its first campus at hyperscaler scale.

The site sits about 350km northwest of Beijing， and the company means to lease further capacity from neighbouring operators on top of the facility it puts up itself.

Borrowed compute clusters were enough while the point was proving efficiency and the runs stayed short.

So the plan now is a facility they controls outright， with at least part of it aimed to come online by the end of next year or early 2028.

Inner Mongolia was chosen partly because it averages around 4C across the year， which cuts the power burned on cooling servers that already draw close to a gigawatt.

A site that size fitted with the newest accelerators costs roughly $50B by Nvidia's own estimate， though Chinese builds typically land far below US prices.

Money looks like the easier half after a record $7B raise at a valuation near $50B， with IPO preparations already underway.

Which chips fill the racks is the part nobody will confirm， and Washington believes Blackwell processors already reached an Inner Mongolia facility despite being barred from sale to China.
