TechCrunch:AI(RSS)
31AI 编辑部评分,满分 100

SpaceX 今年已购入 3.29 亿美元特斯拉 Megapack

2026-08-05 05:07· 41分钟前· Tim De Chant
跳到正文
AI 摘要

SpaceX 今年已斥资 3.29 亿美元购买特斯拉 Megapack 电池储能设备,其中第二季度支出 2.95 亿美元。这些工业级电池很可能部署于 xAI 数据中心,用于平滑 AI 训练和推理带来的电力需求峰值,降低成本和确保稳定运行。此前 xAI 在并入 SpaceX 前已为其数据中心购买了 4.3 亿美元 Megapack。

SpaceX has ramped up purchases of Tesla Megapack, spending $295 million on the battery storage devices in the second quarter and $329 million so far this year, according to the company’s earnings report released on Tuesday.

The purchase illustrates just how interconnected Elon Musk’s universe of companies are. Musk, who is the CEO and largest shareholder of SpaceX, also runs Tesla. Musk’s artificial intelligence business xAI acquired his social media platform, X, in 2025. Earlier this year, SpaceX gobbled up xAI.

The industrial-scale batteries are likely being deployed at the company’s xAI data centers. Before xAI merged with SpaceX, the AI company bought $430 million worth of Megapacks for its data centers. In the first quarter of this year, xAI had purchased only $34 million worth of the equipment. SpaceX also reported that as of December 2025, it had acquired $131 million worth of Tesla Cybertrucks at manufacturer’s suggested retail price, according to its regulatory filing.

Though xAI has leaned heavily on natural gas to power its data centers — including dozens of unpermitted turbines at a site in Mississippi not far from the Colossus data center project — large batteries like the Megapack are still a critical part of data centers. 

In addition to providing substantial backup power that can be tapped in a second or less, batteries can provide extra power to GPUs when they demand it. AI data centers don’t draw power consistently. Rather, their power demand ramps up and down depending on the demands of training AI models and running inference.

Such peaks can incur significant charges from a local utility or overwhelm on-site generators. Batteries help smooth out those peaks, lowering costs while ensuring that the data center can operate consistently.

SpaceX 今年已购入 3.29 亿美元特斯拉 Megapack

TechCrunch:AI(RSS)·2026-08-05 05:07·41分钟前·Tim De Chant
阅读原文· techcrunch.com(在新标签页打开)
AI 摘要

SpaceX 今年已斥资 3.29 亿美元购买特斯拉 Megapack 电池储能设备,其中第二季度支出 2.95 亿美元。这些工业级电池很可能部署于 xAI 数据中心,用于平滑 AI 训练和推理带来的电力需求峰值,降低成本和确保稳定运行。此前 xAI 在并入 SpaceX 前已为其数据中心购买了 4.3 亿美元 Megapack。

原文 · 保持原样,未翻译

SpaceX has ramped up purchases of Tesla Megapack, spending $295 million on the battery storage devices in the second quarter and $329 million so far this year, according to the company’s earnings report released on Tuesday.

The purchase illustrates just how interconnected Elon Musk’s universe of companies are. Musk, who is the CEO and largest shareholder of SpaceX, also runs Tesla. Musk’s artificial intelligence business xAI acquired his social media platform, X, in 2025. Earlier this year, SpaceX gobbled up xAI.

The industrial-scale batteries are likely being deployed at the company’s xAI data centers. Before xAI merged with SpaceX, the AI company bought $430 million worth of Megapacks for its data centers. In the first quarter of this year, xAI had purchased only $34 million worth of the equipment. SpaceX also reported that as of December 2025, it had acquired $131 million worth of Tesla Cybertrucks at manufacturer’s suggested retail price, according to its regulatory filing.

Though xAI has leaned heavily on natural gas to power its data centers — including dozens of unpermitted turbines at a site in Mississippi not far from the Colossus data center project — large batteries like the Megapack are still a critical part of data centers. 

In addition to providing substantial backup power that can be tapped in a second or less, batteries can provide extra power to GPUs when they demand it. AI data centers don’t draw power consistently. Rather, their power demand ramps up and down depending on the demands of training AI models and running inference.

Such peaks can incur significant charges from a local utility or overwhelm on-site generators. Batteries help smooth out those peaks, lowering costs while ensuring that the data center can operate consistently.

阅读原文techcrunch.com(在新标签页打开)