SemiAnalysis Datacenter team tracks all dc sites. Datacenter team started noticing new builds missing the gensets. Datacenter team checked the Industrials Model and now tracks 15GW+ of capacity with no gensets, no central UPS, or neither. (1/3)🧵
AI 导读
SemiAnalysis 数据中心团队追踪所有数据中心站点。数据中心团队开始注意到新建项目缺少发电机组。数据中心团队核查了工业模型,目前追踪到 15GW+ 的容量没有发电机组、没有中央 UPS,或两者皆无。(1/3)🧵
SemiAnalysis Datacenter team tracks all dc sites. Datacenter team started noticing new builds missing the gensets. Datacenter team checked the Industrials Model and now tracks 15GW+ of capacity with no gensets, no central UPS, or neither. (1/3)🧵
来源:SemiAnalysis· x.com